  • Breaker Double Tap
  • Main Breaker Double Tap
  • Buss Bar Lug Double Tap
  • Double Tap off of Main
  • Direct Tap off of Bus Lug
  • Neutral Wire Double Tap
  • Overheated Conductor
  • Main Panel No Shut Off
  • Sub Panel Neutrals/Grounds Together
  • Sub Panel Ground Terminal Not Bonded
  • Knob and Tube Under Insulation 🙂
  • Burried Service Lateral Settlement
  • Zinsco Panel
  • Federal Pacific Stab Loc Panels 🙂
  • Push-Matic Panel
  • Corroded Breaker
  • Un-Grounded Appliances
  • Panel not Wired by an Electrician
  • Loose Breaker
  • 60 Amp Round Meter
  • Undersized Panel Wiring
  • Un-Authorized Breaker Manufacturer In Panel
  • Tandem Breakers Not Allowed
  • Back Fed Breaker Not Secured
  • Panel Opening
  • Overhead Service Lateral Not Secured
  • Overhead Service Tree Contact
  • Out Dated Service Lateral With Missing Insulation
  • Missing Drip Loop
  • Open Junction Box
  • Live Wire Not Terminated
  • Open Light Fixture in Shower
  • Open Neutral Outlet
  • Open Ground Outlet
  • Full Bath No Outlet
  • Hanging Light Fixture